Days swallowed by one dossier
Technical bid, DPGF, forms: a response dossier runs to several days. On a poorly targeted tender, that's all wasted.
E-invoicing mandatory in 2026. Constrigo is already ready.Learn more
Public tenders · Go / No-Go scoring
Putting together a construction bid costs days. Constrigo scores each BOAMP notice from 0 to 100 on clear criteria, sorts the recommended from the marginal, and keeps a record of every Go or No-Go. No predictive AI: rules you can read.
Included in the Pro BTP plan
Should you bid on this notice?
BOAMP monitoring · Go / No-Go decision aid
Roof renovation — primary school, Ville de Bastide
BOAMP 24-104732CPV 45261000
Why this score
Matching categories
Roofing · Waterproofing
Service area
Pyrénées-Atlantiques (64)
Budget compatible
248,000 € · profile range
Keywords detected
“steel decking”, “asbestos removal”
Required certification
Qualibat RGE held
Response window
9 days · feasible
Your decision
The problem
Building a bid takes days. Doing it for a tender you never had a shot at means those days are gone.
Technical bid, DPGF, forms: a response dossier runs to several days. On a poorly targeted tender, that's all wasted.
With no clear criteria, the choice to bid or not comes down to a hunch. Two owners look at the same notice and decide differently.
You replay the same losses — out of area, budget too low, missing certification — without ever learning from them for the next tender.
51
Business modules
400+
Features
1
Mobile app included
IA
Natively built in
Before you put a bid manager on a technical memo, one question: is it worth it? The scoring answers with facts, not a hunch.
Every BOAMP notice gets a score out of 100 based on your trades, your area, the budget, keywords and your certifications. Fixed rules, not a black box.
At 70 and above, the notice rises to the top as a priority. Between 50 and 69 it's a partial match, below 50 a weak match: you see at a glance where to spend your bid-writing hours.
The score opens up: matching trades, area or adjacent area, compatible budget, keywords spotted, required certifications, remaining deadline. You know why before you decide.
One click: Go (response in progress) or No-Go (declined). A declined notice leaves your list, and the won-or-lost result feeds your win rate — which then nudges later scores.
BOAMP notices are imported and matched to your company profile: trade categories, service areas, certifications. One source, traceable.
Each notice is scored on trades, area (or adjacent area), budget, keywords, certifications and remaining deadline. The breakdown of reasons stays visible: nothing is hidden.
At 70 and above, the notice is flagged Recommended. You decide in one click: Go (response in progress) or No-Go (declined). The decision is dated and tracked.
Each result, with its loss reason, feeds your win rate per trade. That rate adds a bonus to later scores: tomorrow's decisions lean on yesterday's results.
Use case
Bastide SAS, plumbing and heating, gets two recommended notices on the same day. Which one truly deserves a bid?
Constrigo shows a score for each, computed on the same criteria: trades, area, budget, keywords, certifications, deadline.
The 38 tender is red on area, budget and certification; the 82 one is green on trade, area and budget.
GO on the 82, NO_GO on the 38: the firm pours its bid-building days into the only winnable contract.
At the end, the firm logs WON or LOST with the reason; the win rate feeds the score of future notices.
Rather than splitting its energy across two dossiers, Bastide SAS put it on the one it could win — and keeps a record to sharpen the next round of sorting.
Réfection toiture — groupe scolaire
Ville de Bastide · 64
Technical memo to finalise
What changes
Each marker below maps to a real scoring rule, not a promise of victory.
3 tiers
≥70 excellent match, 50-69 partial match, <50 weak match. You read the tier before the detail.
6 criteria
Trades, area (and neighbours), budget, keywords, certifications, deadline: every point gained or lost is spelled out.
Go / No-Go
Each notice is marked GO or NO_GO, then won or lost with its reason. Nothing gets decided twice in a vacuum.
With / without Constrigo
Same recommended notice, two ways to decide.
Who it's for, what it's built on
Go / No-Go scoring is included in the Pro BTP plan. The score is deterministic: no opaque win prediction, just rules you can verify.
You decide fast, between two meetings: the tier and the reasons give you the call at a glance.
You pool your decisions: everyone reads the same score and the same loss reason.
The more you bid, the more the per-category win rate refines the sorting, tender after tender.
0-100 score
The deterministic result of the calculation, with its readable reasons.
Go / No-Go decision
The flag that records whether the firm bids (GO) or passes (NO_GO) on a notice.
Won / lost outcome
The outcome logged after the award, with the loss reason where relevant.
Win rate
Computed from your history, it feeds a score bonus on the next notices.
Go/No-Go scoring gives each BOAMP notice a score from 0 to 100 using fixed rules — trade match, zone, budget, keywords, certifications, deadline — to decide whether to bid. Above 70, a notice is « Recommended »; everything is shown line by line, with no black box or trained model.
About Constrigo
Should you bid on this construction tender? The question comes up with every notice published on the BOAMP, and the wrong answer is expensive: a bid built for nothing means days of a manager's time gone. Constrigo's Go / No-Go scoring gives each notice a score from 0 to 100 — the match score between the public tender and your company. That score is deterministic: it rests on clear rules — trade categories, service area or adjacent area, compatible budget, tender keywords, required certifications and remaining deadline. No trained model, no black box; with equal criteria, the score doesn't move. A notice reaching 70 is flagged "Recommended"; between 50 and 69 the match is partial; below 50 it's weak. The breakdown of reasons shows on every line, which makes the Go or No-Go decision explainable to your team and your management alike. Once you commit, you track the outcome: tender won or lost, with the loss reason. That feedback feeds your win rate per trade, which adds a bonus to later scores — simple, transparent learning built on your own results rather than an opaque prediction. You spend your bid-writing hours on the tenders where you genuinely stand a chance, and stop responding by reflex to notices that don't fit. Decide fast, decide right, and keep a record of every choice: that's the whole point of tender scoring. Upstream, public-tender matching is what surfaces the relevant BOAMP notices; scoring then steps in, on a given notice, to settle whether it's worth a bid.
See in a few minutes how Constrigo scores your BOAMP notices and tracks your Go / No-Go decisions.