E-invoicing mandatory in 2026. Constrigo is already ready.Learn more

Constrigo

Public tenders

Win public construction tenders without losing your nights

Constrigo surfaces the BOAMP notices made for your company, then builds the file with you: DCE analysis, DPGF pricing, technical proposal and a predictive score. You stay in control, the AI drafts.

app.constrigo.fr/marches-publics/appariement
Example

Matched notices

BOAMP monitoring · AI matching

RecommendedScore

18

New notices

5

Recommended

2

Due in < 7 days

92/100

Flat-roof renovation — primary school

Recommended

Mairie de Pau·BOAMP 24-091847

CPV 45261000Service area · 64
J-6248 000 €
87/100

Energy retrofit of 42 dwellings

Recommended

OPHLM Lyon·BOAMP 24-088210

CPV 45453000Qualibat RGE
J-121 240 000 €
74/100

Construction of a school canteen

Métropole GRD·BOAMP 24-090455

CPV 452142104 similar references
J-3615 000 €
68/100

Roads and utility networks — subdivision

Commune de Tarbes·BOAMP 24-087933

Service area · 652 similar references
J-18430 000 €
61/100

Renovation of the municipal gymnasium

CD Landes·BOAMP 24-089012

CPV 45212220
J-9890 000 €
Daily matching · 18 BOAMP notices analysed this morning

Trust you can check

  • Notices come from BOAMP, the official journal — not an opaque aggregator.
  • GDPR-compliant: you delete your account and data whenever you decide.
  • A score that follows the RC's published grid, not a black box.
  • Free to start
  • No credit card
  • Mobile app included

51

Business modules

400+

Features

1

Mobile app included

IA

Natively built in

From BOAMP notice to submission

  1. 1

    The tender comes to you

    BOAMP notices that fit your trade and area rise to the top, flagged "recommended", with notice number and deadline.

  2. 2

    The AI reads the DCE

    Analysis of the consultation file: required documents, scoring criteria and the rules you can't afford to miss.

  3. 3

    The DPGF pricing

    You fill in the price breakdown line by line (DPGF), with your own prices and units.

  4. 4

    The technical proposal

    The proposal is drafted from your references and winning paragraphs, then scored predictively against the RC grid.

  5. 5

    The submission

    DC1/DC2/DC4 forms, compliance checklist and file assembly. You submit a complete bid.

Score before you submit

A score built on the grid, not a crystal ball

Before you submit, Constrigo scores your technical proposal criterion by criterion, against the grid published in the consultation rules — the same weights the panel will use. You see where the file loses points while there's still time to fix it. It isn't a probability of winning.

  • Criterion by criterion, on the RC's exact grid
  • You spot the criterion that drags the score down
  • A decision aid, not a promise of victory
app.constrigo.fr/marches-publics/dossier/24-091847/score
Example

Predicted tender score

Mairie de Pau·BOAMP 24-091847

RC grid
78/100
Good+8 pts reachable
Scoring calibrated on the RC gridBastide SAS

Scoring criteria

Technical value

Weight 50%Technical score
41/50(82%)

Execution methodology

17/20

Human & material resources

16/20

Quality / safety approach

8/10

Price of services

Weight 40%
30/40(75%)

Delivery time

Weight 10%
7/10(70%)

Execution schedule lacks per-lot detail

Priority action

Detail the per-lot phasing in the memo (+5 pts)

With / without

Answering a tender, with and without Constrigo

Same steps, two workloads. On the left, doing it by hand; on the right, the Constrigo brick that takes it on.

Without Constrigo
With Constrigo
Finding the right tenders
Comb through BOAMP every morning, miss one in two.
Notices matched to your profile rise up, flagged "recommended".
Reading the DCE
Reread 60 pages by hand and miss a knock-out criterion.
The AI analyses the DCE and surfaces criteria, required documents and traps.
Pricing the DPGF
Re-key the price breakdown into a separate spreadsheet.
The breakdown is filled line by line in the tool, with your own prices.
Writing the technical proposal
Start from a blank page for every consultation.
The proposal is drafted from your references and winning paragraphs.
Filling the DC1/DC2/DC4 forms
Download the forms, fill them by hand, forget one.
The forms are assisted and gathered in the same place as the file.
Gauging your odds
Discover your score once the result is out.
A score against the RC grid, criterion by criterion, before you send.
Building on past bids
Each bid starts from scratch, past work evaporates.
Library of winning bids, paragraph bank and references reused.
Included from Pro BTP

No add-on to buy for public tenders

Public tenders are part of the Pro BTP plan: BOAMP matching, the bid file, the RC-grid score and the reusable library. The AI blocks switch on with your Anthropic key.

  • The whole tender module included in Pro BTP, at no extra cost
  • No à-la-carte module, no surprise line on the invoice
See the pricing grid
In short

Constrigo helps construction firms respond to public tenders on BOAMP, its single source: matching of notices to your profile, a readable score built on the RC's published grid, generation of the DC1, DC2 and DC4 forms, and a library of reusable technical bids. No black-box prediction of victory — a score whose criteria you can see, available from the Pro BTP plan.

Yes, on BOAMP. Constrigo matches published notices to your company profile and surfaces the recommended tenders, with notice number and deadline. The matching covers BOAMP and promises no other source. The feature opens on the Pro BTP plan.

About Constrigo

Construction tender software has only one final judge: the contract won. Responding to a public construction tender eats time few firms have to spare — combing through BOAMP, reading the DCE, pricing the DPGF, writing the technical proposal, filling the DC1, DC2 and DC4 forms, then assembling everything before the deadline. Constrigo takes on each of these steps without taking the decision away from you. Tender matching pairs BOAMP notices with your company profile and surfaces the contracts where you stand a chance, with notice number and deadline in plain sight. AI analysis of the DCE flags the scoring criteria and the traps buried in the consultation rules. The technical proposal is drafted from your project references, your library of winning bids and your paragraph bank, then given a predictive score aligned with the RC grid, criterion by criterion. You know where the file loses points before you send it. Bid after bid, your history turns into an edge: the AI reuses what has already won, and each response starts less from scratch than the last. The public-tender features open on the Pro BTP plan, the most complete tier, and the AI blocks switch on with an Anthropic key. From the published notice to a complete submission, Constrigo shortens the path without promising anything the code can't actually do.

Your next tender, submitted complete

Let Constrigo surface the BOAMP notices made for you and build the file with you, from DCE analysis to technical proposal.

Start for free